Control Joints & Expansion Joints Replacement

Project Detail

  • General construction and building renewal services across Terminal 1, Terminal 3, airside, and landside airport facilities.
  • Structural and architectural repairs including crack repairs, concrete spall repairs, expansion joint replacement, and control joint replacement.
  • Interior renovations such as new framing, drywall installation, drywall repairs, full skim coat, sanding, priming, and painting.
  • Ceiling work including T-bar grid replacement, ceiling tile installation, drywall ceilings, bulkheads, and lighting integration.
  • Flooring installation and repairs including vinyl flooring, carpet tiles, tile flooring, and epoxy floor coatings.
  • Door, frame, and window replacements, including AODA-compliant hardware and fire-rated assemblies.
  • Mechanical and HVAC modifications including diffuser relocations, new diffusers, duct adjustments, and tie-ins.
  • Electrical work including installation of new outlets, new circuits, data conduits, lighting fixtures, occupancy sensors, and panel modifications.
  • Plumbing upgrades and installations including new sinks, faucets, drains, supply and waste lines for kitchenettes and office upgrades.
  • Office alterations including new partitions, flooring, ceilings, lighting, outlets, cabinetry, millwork, and reconfiguration of work areas.
  • High-finish interior renewal including complete touch-ups, caulking, patch repairs, and detailed clean-ups to meet airport quality standards.