Location: Whitby Go Station
Client: Metrolinx
Project Scope: Star Group Canada Ltd. completed the demolition and removal of an existing shelter structure at Whitby GO Station. The work was carried out in an active station environment.
Project Details
Main Scope of Work Included:
- Site setup, staging, and installation of barricades and hoarding.
- Disconnection and removal of electrical components associated with the shelter.
- Controlled demolition of the existing shelter structure, including roof, framing, glazing, and concrete base.
- Removal and disposal of demolition materials.
- Protection of adjacent walkways and station areas during demolition.
- Site cleanup and restoration of the area after demolition.
- Coordination with Metrolinx operations and completion of work in an active station environment.